SAMPLE DATA — 演示用样板图片与参数,非真实产品资料。上线前请在 app/data/sample.ts 关闭 SAMPLE_MODE。

Documentation · 3 min read

What Information Helps Technical Matching?

Which details make an initial matching recommendation faster and more accurate.

The four details that matter most

Most requests can be moved forward with four pieces of information.

  • The gas
  • The working pressure
  • The inlet thread
  • The outlet connection

Then the context

The country of use, any certification requirement your customer has stated, and the volume you expect. These do not change the physical fit, but they change which options are relevant to discuss.

What we do with it

A person reviews your submission. You receive an initial matching recommendation, not an automated result — and final suitability is always confirmed before anything is supplied.

Before you contact us

  • · A clear photo of the existing valve
  • · The gas and its typical working pressure
  • · Inlet thread and outlet connection, if known
  • · The country the valve will be used in

Final compatibility and regulatory suitability require technical confirmation.

Start Technical Matching